SEARCH BY MODEL, FLOW, HEAD OR APPLICATION
Engineering Article

如何计算水泵扬程

2026-08-10 Calculation

{ $fields.summary }

Total head is not the lift height — it is the total energy the pump must overcome.

Head formula

Total Head (m)H = Hstatic + Hfriction + Hvelocity + Hresidual

Estimating friction loss

In a 100 m galvanised steel line at 20 m³/h, a DN80 pipe loses about 8–10 m. Bends and valves add equivalent pipe length.

Note
On long runs friction can outweigh static lift — never size by measuring height alone.

Measure for accuracy

For retrofit projects especially, measure the real system curve with a flow meter and gauges.

ParameterSymbolUnit
Static liftHgeom
Friction lossHfm
Residual pressureHrm

Add the three and you have the required total head.

Spec Help For Your Project?

Send flow, head and medium — we respond with a model recommendation within 24 hours.

Ask An Engineer
Source Your Next Order With One Export Partner
Request A Quote